Saturday, July 19, 2008

FUSION Setting

Below are some FUSION setting to start with.

Fusion = FCL (Forcord Controller System)

Recommended for Fusion console PC is a P4 and runs on XP. You can use a P3 PC but it will surely runs slow. Also you will need MS OFFICE.

Recomended distence between a power cable and communication cable is at least 20cm with dedicated conduit. There is no join allow between cables. Only 1 joint from Fusion to Dispenser. For current loop communication cable must use (0.5mm twisted and shielded cable)

For a motorcycle dispenser you will need two different cable to connect to 2 different CPU boar in the dispenser. another reason is Fusion will not communicate to 2 CPU using 1 Cable even though its run on current loop.

Jumper on LOOP board
Wayne = OFF
Gilbarco = ON

IP for Fusion is 192.168.1.20.

Login: ADMIN
Password: (enter)

Configuration.
-> Generic.
MODUEL = FORCORT MANAGER DESCRIPTION
-> DEVICES -> OTHERS (SERCH) -> WIZARD
-> Configuration -> maintanance -> apply configuration.

Port name:- dev/ttyUSB0
/dev/gribport1

Operation -> Forcort -> Forcourt Status (Current Status)

Change Price
Configuration -> Price -> Price Change
Submit
Price Change Update.

Friday, July 18, 2008

FUSION

FUSION or its original name last time was TEQUILA is a for-cord control system by Dresser Wayne. Install some in Malaysia and thru my observation it is a very good controller and most important Robust. Below brousher will explain more detail of its capability.  












Saturday, March 15, 2008

How to clear S01 to S06 statistic on Wayne 3V's & 4V's

- Select the statistic number and press "enter" key
- Press "#" key and you will see at the sales amount showing "clear totals"
- Press the "enter" key and the sales amount will show "PASS"
- Type the password "142"
- Press "enter" key to erase the data
There you go now you have it all clear.

Tuesday, February 26, 2008

Oil Co's Safety Terms.

I would like to share some of the safety terms that usualy used by the Oil Companys Especially Exxon.

WCS = Work Control System. safety
WCP = Work Control Procedure
SWP = Safe Work Procedure
PTW = Permit To Work
JSA = Job Safety Analysis
SPSA = Safe Performance Self Assesment
LPO = Lost Prevention Observation
RA = Risk Assessment
HI/PI = Hazard Identification / Potential Incident
NM = Near Miss
JCF = Job Clearance Form
CSD =  Critical Safety Device
MSDS = Material Safety Data Sheet
USV = Unanounce Site Visit
LOTOTO = Log Out Tag Out Test Out


Psssss date posted is as per my diary